Liebherr-Aerospace Wins KLM Cityhopper Embraer E175 Landing Gear Overhaul Deal
Liebherr-Aerospace has signed a comprehensive agreement with KLM Cityhopper to overhaul landing gear across the regional carrier's Embraer E175 fleet.
German aerospace equipment manufacturer and aftermarket specialist Liebherr-Aerospace has finalized a major maintenance agreement with Dutch regional carrier KLM Cityhopper to provide comprehensive landing gear overhaul services for the airline's Embraer E175-E1 aircraft fleet. The contract encompasses full lifecycle depot-level maintenance, structural overhauls, and component testing across both main landing gear and nose landing gear assemblies, ensuring operational airworthiness for one of Europe's largest regional feeder networks.
Under the terms of the agreement, the dedicated overhaul campaign is scheduled to commence in November 2027. All overhaul and reconditioning activities will be carried out in-house at Liebherr-Aerospace's specialized manufacturing and maintenance facility located in Lindenberg, Germany. The site serves as the company's global center of excellence for flight control systems and landing gear engineering.
Multi-Year Scope at Lindenberg Center of Excellence
KLM Cityhopper, the regional subsidiary of KLM Royal Dutch Airlines based at Amsterdam Airport Schiphol, currently operates an extensive regional fleet connecting secondary European cities to the SkyTeam alliance hub. The newly signed contract builds directly upon a longstanding commercial and engineering partnership established between the two companies during a previous overhaul program covering KLM Cityhopper's larger Embraer E190 fleet.
Thom Grobben, Vice President of Technical Services and Fleet Development at KLM Cityhopper, emphasized the operational value of extending their collaborative arrangement. He stated that the agreement strengthens their long-term partnership established through the E190 landing gear overhaul program, noting that the carrier values Liebherr's technical expertise and looks forward to continuous support in delivering mission-critical maintenance services for regional flight operations.
OEM Lineage Across the Embraer E-Jet Family
The contract highlights Liebherr-Aerospace's dual role as both an original equipment manufacturer and an independent maintenance, repair, and overhaul provider. Liebherr developed and manufactures the complete landing gear systems, including electro-hydraulic actuation mechanisms and multi-disc brake assemblies, for the entire first-generation Embraer E-Jet aircraft family, which encompasses the E170, E175, E190, and E195 models.
By utilizing the manufacturer's dedicated tooling, proprietary technical data, and specialized overhaul lines in Lindenberg, KLM Cityhopper secures guaranteed turnaround times, access to rotable spare pools, and direct component repair schemes that eliminate third-party logistics overheads. The contract also integrates scheduled preventative servicing and service bulletin incorporation to address wear mechanisms identified across regional operating cycles.
The Engineering View: Regional Jet Landing Gear Stress Profiles
From an aeronautical engineering perspective, landing gear systems on regional airliners endure significantly higher mechanical fatigue and cycle accumulation compared to long-haul commercial aircraft. Operating multiple short-range flight sectors per day with frequent takeoff and landing cycles, regional landing gear structures experience severe dynamic landing impacts, intense cyclic braking thermal loads, and accelerated ground taxi vibrations.
A full depot-level overhaul requires complete disassembly of shock struts, bogie beams, torque links, and retraction actuators. Technicians strip protective paint and anti-corrosion platings to conduct non-destructive testing, including magnetic particle and eddy-current inspections, to detect micro-cracks in high-strength steel forgings and aluminum alloy components. Hydraulic seals, bushings, and cadmium or high-velocity oxygen-fuel coatings are systematically renewed, followed by full hydrostatic pressure testing and dimensional calibration before reassembly, ensuring the assemblies return to zero-time operational standards.
Sources
Spotted an error or have a tip? [email protected]




